Revitalization of production areas
- Operation:
- Production plant – chassis systems
- Implementation:
- March 2026
- Load:
- Over 5 tonnes
- Customer specification:
- The client is implementing significant changes in a section of the production area. Following the removal of the original technology, it was necessary to revitalize the entire production facility. This was followed by the installation of new technological units. The client requested durable epoxy coatings in the shade RAL 7032

Marking of production halls
- Operation:
- Manufacture of automotive components
- Implementation:
- April 2026
- Load:
- High, machinery over 5 tonnes
- Customer specification:
- Comprehensive renewal of markings in one of the production halls. The client has various types of floors in this hall (concrete, steel fiber reinforced concrete, tiles, etc.). The marking must be selected with respect to the operation and the different floor types

Marking of a logistics hall
- Operation:
- Supply chain logistics
- Implementation:
- April 2026
- Load:
- High, machinery over 5 tonnes
- Customer specification:
- Comprehensive renewal of markings in one of the client's three halls. The client is a major logistics provider operating in 13 countries

Application of anti-slip coating between production lines
- Operation:
- Production plant – manufacture of intake and exhaust valves for internal combustion engines
- Implementation:
- April 2026
- Load:
- Up to 5 tonnes
- Customer specification:
- To solve extreme slipperiness of walkways between production lines. Problematic surface (tiles). The client requested extreme speed of execution and high functionality. Several slips, falls, or workplace injuries had occurred in this area. We selected an epoxy anti-slip coating system with a coarser aggregate fraction of 0.8–1.2 mm. Color shade grey RAL 7032. The complete application was completed within 48 hours