Synthetic flooring - production hall (Germany)
Description of implementation
-
Operation:Pump manufacturing plant
-
Realization:September 2025
-
Load:Over 5 tons
-
Customer input:To create a brand new surface from an old concrete floor. The solution was an epoxy screed in a non-slip design. Shade grey RAL7001.
-
Range:550 m2
-
Locality:Germany
INTERESTED IN A SIMILAR PROJECT?
Photogallery



